Hydro Ingenieure - Vision to clear solutions

GVU Melk – Waste recovery centre

Tasks definition
  • Construction of waste recovery centres comprising office and sanitary containers, problematic materials storage area, waste grading hall, container storage area, Strauchschnittlagerplatz
  • Preparation of a model which would be applicable for all areas that means, same appearance on properties with different topography conditions (simply plane site – difficult slope area)
  • Taking into consideration of different transport connections respectively different road connections
  • Elaboration of possibly easier and safer recognizable conditions (for all braches) for utilization by clients and operation staff
Solution
  • Variable basis model
  • Clear traffic control
  • Functional operation for clients and operation staff
Services
  • Advisory services
  • Draft design and design for permissions
  • Elaboration of BoQ and tender documentation
  • Contracting
  • Construction time plan
  • Construction supervision
  • Design coordination
  • Monitoring of implementation
  • Invoice certification
Facts
  • Client: GVU Melk
  • Project period: 2006 - ongoing
  • Total costs: approx. € 6.140.000,–
  • Contact person: Christian Kopetzky, MSc