Logistic centre Nah&Frisch company Kiennast

Tasks definition
  • Extension of an existing logistic centre by adding of dry products storage area
  • Construction of a deep-freeze tower (-27°C) and freeze storage area for dairy products (+4°C)
  • Rehabilitation of existing small cooling device and rehabilitation of heating centre

Solution
  • Heating and cooling centre as energy contracting-solution
  • Radiant heating system in the dry products storage area for avoidance of stirring up of dust
  • Supervision system for the documentation of room temperatures in the cooled areas
  • Cooling devices with waste heat recovery utilized for heating of water for existing meat-processing section
  • High efficient lightning technology
  • Emergency lightning in LED-Technology

Services
  • Heating, ventilation, cooling (deep freeze temperature), Sanitary, complete LV and HV connections
  • Preliminary design
  • Draft design
  • Design for permission
  • Detailed design
  • Preparation and assistance within the contracting
  • Approval for installation design
  • Construction supervision
  • Taking-over
  • Defects liability period supervision

Facts
  • Client: Architect Franz W. Friedreich
  • Gross area: approx. 15.500 m²
  • Project period: 2004 - 2006
  • Total budget: approx. € 4.500.000,–
  • Contact person: Andreas Biegler, BSc